- 17,850 SF Warehouse with Office on 1-acre pre-developed site in Suwanee, GA. Completed in August of 2025.
 
  - Pre-engineered metal building structure with standing seam roof and brick/EIFS (artificial stucco) cladding over metal wall panels.
 
  - Site development includes private sewer main, master stormwater detention system and 22' gabion retaining wall.
 
  
 
Special project features include:
  - Two (2) each dock-height doors and one (1) grade-level door for cross-dock logistics.
 
  - The use of an engineered gabion (baskets filled with boulders) retaining wall to maximize the buildable area of the site; an acre is 43,560 SF and the building is nearly 18,000 SF plus almost another 18,000 SF in parking and driveways.
 
  - The foundation was designed and built with future sanitary stub-ups and a fire sprinkler sleeve in place, meaning neither the slab nor the pavement will need to be cut for future build-out.