Dominy Construction Group
Dominy Construction Group
  • Home
  • About
    • Team
    • Our Story
    • Our History
  • Project Gallery
    • Petal and Pond
    • Spa Nail Supply
    • Crawford and Boyle LLC
    • Metro Bag Expansion
    • NIRVC Center
    • Hands of Christ Co-op
    • Kind Touch Healthcare
    • ABBS
    • Ga Sports Park Pavilion
    • Bim's Package Store
    • Holtkamp Headquarters
    • Aviation
    • Institutional
    • Industrial
    • Retail
    • Office/Medical
    • Remodel/Renovation
    • Projects Overview
  • Services
  • Gallery
  • Testimonials
  • Contact Us
  • More
    • Home
    • About
      • Team
      • Our Story
      • Our History
    • Project Gallery
      • Petal and Pond
      • Spa Nail Supply
      • Crawford and Boyle LLC
      • Metro Bag Expansion
      • NIRVC Center
      • Hands of Christ Co-op
      • Kind Touch Healthcare
      • ABBS
      • Ga Sports Park Pavilion
      • Bim's Package Store
      • Holtkamp Headquarters
      • Aviation
      • Institutional
      • Industrial
      • Retail
      • Office/Medical
      • Remodel/Renovation
      • Projects Overview
    • Services
    • Gallery
    • Testimonials
    • Contact Us
  • Home
  • About
    • Team
    • Our Story
    • Our History
  • Project Gallery
    • Petal and Pond
    • Spa Nail Supply
    • Crawford and Boyle LLC
    • Metro Bag Expansion
    • NIRVC Center
    • Hands of Christ Co-op
    • Kind Touch Healthcare
    • ABBS
    • Ga Sports Park Pavilion
    • Bim's Package Store
    • Holtkamp Headquarters
    • Aviation
    • Institutional
    • Industrial
    • Retail
    • Office/Medical
    • Remodel/Renovation
    • Projects Overview
  • Services
  • Gallery
  • Testimonials
  • Contact Us

Spa Nail Supply

  • 17,850 SF Warehouse with Office on 1-acre pre-developed site in Suwanee, GA. Completed in August of 2025.
  • Pre-engineered metal building structure with standing seam roof and brick/EIFS (artificial stucco) cladding over metal wall panels.
  • Site development includes private sewer main, master stormwater detention system and 22' gabion retaining wall.

Special project features include:

  • Two (2) each dock-height doors and one (1) grade-level door for cross-dock logistics.
  • The use of an engineered gabion (baskets filled with boulders) retaining wall to maximize the buildable area of the site; an acre is 43,560 SF and the building is nearly 18,000 SF plus almost another 18,000 SF in parking and driveways.
  • The foundation was designed and built with future sanitary stub-ups and a fire sprinkler sleeve in place, meaning neither the slab nor the pavement will need to be cut for future build-out.



    Copyright © 2019 Dominy Construction Group - All Rights Reserved.


    Powered by