Your Subtitle text

Chamblee-Tucker Christian Fellowship Hall | Expansion


NEW COMMERCIAL KITCHEN AND FELLOWSHIP HALL

  • Interior construction: 450 SF fully-equipped commercial kitchen as well as a 2,100 SF fellowship hall within an existing 5,500 SF multipurpose structure built by DCG in 2012
  • Exterior: 380 SF for extra storage and installation of a new 1,500-gal grease trap onto an existing sanitary line

    Fellowship Hall

  • Vaulted suspended acoustical ceiling, sheet rock head walls along side aisles for downlighting
  • Theater-style lighting is LED with custom-designed switching
  • Includes foyer/narthex, 4 classrooms, three restrooms, and assembly hall
  • Commercial Kitchen includes:

  • All plumbing, electrical and fuel connections for owner’s appliances
  • Fire suppression vent hood
  • Custom aluminum roll-up shutter with powder coat paint and hand crank opener
  • Metal studs with fiberglass-reinforced paneling (FRP) on kitchen walls
  • Ceramic tile floor and base
  • Washable ceiling tiles with stainless steel tiles at hood
  • Pass-through window with stainless steel trim and countertop
  • Church continued normal operations throughout the construction process.
Website Builder